RIGGING HARDWARE EXPERT

20 Years Manufacturing Experience

A-345 Master link assembly (forged main link)

Short Description:


  • Packing: Packed in the gunny bag or carton then put on the pallet
  • Production Capacity: 500T/month
  • Sample Time: Within 3 days after confirmation
  • Delivery time: According to your order quantity
  • Port: Qingdao
  • shipment: By sea, air or express
  • Payment: T/T, L/C
  • Product Detail

    Product Tags

    ITEM NO.in WEIGHT/KG WLL/T B.L/T Amm Bmm Dmm amm bmm dmm smm
    3/4 1.55 4.1 20.5 140 70 20 85 40 14 7.6
    1 3.29 8.4 42 178 89 25 100 60 18 8.4
    1-1/4 7.18 14.1 70.5 220 110 32 100 60 22 13.5
    1-1/2 12.91 21.3 106.5 264 135 38 180 100 28 16.5
    1-3/4 21.25 33.3 166.5 305 152 45 180 100 35 18.5
    2 30.34 40.3 201.5 356 178 50 180 100 38 -
    Note:Ultimate load is 4 times the working load limit

    图片1


  • Previous:
  • Next:

  • WhatsApp Online Chat !